Proprietary market intelligence · United States and Canada · Beta, updated 26-11-16

The KTX Data Center & Space Race Map

See the concrete demand before the first shovel hits the dirt. We track hyperscale AI data centers and commercial spaceports, plus LNG and heavy industrial megaprojects, from early filings to vertical pour, and map them against cement and SCM supply.

Coverage today: large data center projects across the United States; every spaceport on the FAA list plus Spaceport Nova Scotia; LNG, chip fabs, battery, solar, steel, aluminum, chemical, pharma and nuclear megaprojects in a growing number of states, British Columbia and Ontario; the first Canadian data centers; and the first rocket and satellite factories. More heavy industrial projects, Canadian data centers and space manufacturing sites are being added daily. If a state shows no projects, that means none are tracked yet, not that none exist.

Built by KTX Cattleman Capital's Advisory and Consulting Division, leveraging 25+ years of executive commercial leadership in cement, ready-mix concrete, aggregates and supplementary cementitious materials, our data equips producers, distributors and capital allocators to capture high-margin volume before competitors know a project exists.

Request a custom market audit
Tracked projects0in view
Under-construction CapEx$0BStages 3 and 4, where published
Data center pipeline0 MWPublished or derived MW
Indicative concrete0Million CY

Project list

ProjectStateSectorStageCapEx ($B)MWIndicative CY

How to read the estimates

KTX Proprietary Estimate. Concrete (CY), portland/PLC cement (tons) and SCM (tons) figures are order-of-magnitude market estimates prepared by KTX Cattleman Capital LLC from public filings and published mix-design ratios. They are shown as ranges, are not engineering work product, a specification or a bid, and actual quantities can differ widely. Where a project files its own quantity, we show that figure instead. LNG plant estimates use a CapEx-based range calibrated to a published LNG plant quantity. Estimates for other process plants (steel, chemicals, power) and any single result above 3 million CY are withheld until we can check them against published project quantities.

Project data comes only from public sources: government filings, company releases and news reports. Locations are approximate unless a card says otherwise. Inclusion does not mean a project will be built or that any company endorses KTX. The map is updated weekly. Data center project records adapted from Data Center Census (AI Laws By State LLC), licensed CC BY 4.0; KTX mapped their statuses to our five stages, selected fields and added materials estimates. Full terms: Legal and disclosures.